Electric metre not supply the power
Complain ID : JGJN058832 112
- State : Uttar Pradesh
- City : Deoband
- Address: Ambehta Sehka
Related complaints
-
Very very low voltage in our areaArpit Agarwal / Electricity Board Complaint / July 9, 2022 / Ghaziabad / Uttar PradeshSir, we are facing very low voltage in our area only 140-150voltage since from last month and because of this problem we can't even sleep at night because fans are also not able to move in this kind of voltage and as you know that it's a summer time ...
-
Power fluctuation problemRamesh Chand Katara / Electricity Board Complaint / June 28, 2022 / Agra / Uttar PradeshDear sir as per my last email. There is no solution given yet. Power failure problem still not resolved. Fluctuation problem happing ever day so pls change my face connection. And resolve problems as soon as possible. Thanks Ramesh Chand Katara Servi...
-
Prepaid meter not worked for 1 years and connection also not cutting.DEVENDRA / Electricity Board Complaint / June 24, 2022 / Lucknow / Uttar PradeshPrepaid meter not working for last 1 year and connection is also not cutting bill is increasing day by day
-
New domestic not provided by electricity boardHarikishan rajput / Electricity Board Complaint / June 20, 2022 / Agra / Uttar PradeshDear Sir First' I'm not living any type of colony. Second, the service no 705118193 (bhupendra singh) is recently installed at my nearby and using the electricity upto 350 meter. But I'm not eligible, how can this possible. I'm not apply for commerci...
-
Please Help- For BIJLI CONNECT HELP- APPLICATION NUMBER : 1010818798VIJAY tiwari / Electricity Board Complaint / June 18, 2022 / Loni / Uttar PradeshShrimaan Ji Pranaam, Mai Pt. Vijay aapse nivedan kar raha hu ki hamare Ghar par bijli connection JE sahab nahi de rahe hai. Khamba 70 MTR hai Ghar se es karan se. Kripya Madad kijiye. Hamre 2 chhote chhote balak hai.Jinki padai-Likhai kharab ho rahi ...
-
Connection related issueAfzal Ahmad / Electricity Board Complaint / June 14, 2022 / Agra / Uttar PradeshI was applied torrent electricity connection before 2 months and they told me maximum 15 to 30 days meter will be installed and connection willbe ready. I have complete all tha documents and submit estimate o 9th May. But after 2 months still my conn...
Service issue | Complaint | Query | Feedback | Suggestion | Reply